- Overview
- Product Description
- Product Parameters
- Detailed Photos
- Certifications
- Packaging & Shipping
- Company Profile
- FAQ
Basic Info.
Model NO.
CSSB-120W/20V
Number of Cells
108
Application
Light Industry
Condition
New
Certification
ISO, CE, RoHS
Material
Monocrystalline Silicon
Transport Package
Carton
Specification
520*370*50mm
Trademark
Evergrn
Origin
China
HS Code
8541430000
Production Capacity
50000
Packaging & Delivery
Package Size
7.00cm * 5.00cm * 1.00cm
Package Gross Weight
6.000kg
Lead Time
20 days (1 - 10000 watts)
To be negotiated ( > 10000 watts)
To be negotiated ( > 10000 watts)
Product Description
120W Mono Portable Foldable Flexible Solar Photovoltaic PV Panels Panel
Flexible solar panels offer the benefits of a traditional solar system in a more portable package. Unlike rigid solar panels used in home installations, flexible solar panels are thinner alternatives for off-grid and mobile installations. They aren't powerful enough to run a house but provide adequate power for boats, RVs, campers, or camping sites.
Flexible panels are ultra-thin, lightweight panels that are easily installed. They're also bendable, making them easier to attach to a curved roof or window. Typical flexible panel installation involves using adhesive tape or velcro to mount the panels, compared to the stiff mounting racks used for traditional rooftop installations.
Item | Data |
Power Model | LSFC-120 |
Maximum Power (Pmax) | 120W |
Battery Conversion Efficiency | >20% |
Output Working Voltage | 5v/3.4A,9v/5A,12v/1.5A |
Type-C Output | 5v/3A,9v/2A,12V/1.5A |
Output Operating Voltage | 18V/6.5A |
Working Temperature | -20-60ºC |
Short-Circuit Current | 6.05A |
Expand Size | 520*1660*13mm |
TFold Size | 520*370*50mm |
Weight | 4.7Kgs |
Certifications | CE, RoHS, ISO |







Shanghai Evergrn Technology Group Co.,Ltd
EVERGRN have been providing full categories of battery chargers, inverters, portable power station, solar panels, solar energy system and various of renewable energy products with 6+ years' experience, and we have been supplying these products with vertical setup.
EVERGRN are committed to providing one-stop service for Our Wholesalers/Dealers etc., and to providing off-the-shelf and customized design service.
EVERGRN have complete certificates CE/FCC/ROHS/PSE/ISO9001. And we have always provided professional engineer support and competitive prices.
EVERGRN support OEM/ODM services.
EVERGRN have been providing full categories of battery chargers, inverters, portable power station, solar panels, solar energy system and various of renewable energy products with 6+ years' experience, and we have been supplying these products with vertical setup.
EVERGRN are committed to providing one-stop service for Our Wholesalers/Dealers etc., and to providing off-the-shelf and customized design service.
EVERGRN have complete certificates CE/FCC/ROHS/PSE/ISO9001. And we have always provided professional engineer support and competitive prices.
EVERGRN support OEM/ODM services.
Q1:Why choose us EVERGREEN? A1:We have around 6 years experiences on power supply (Inverter/Battery Charger/ Transformer/Portable power stations/Solar Panels/Portable solar energy system). |
Q2: What's the MOQ and Leading time for EVERGREEN? A2:No MOQ for the first order, samples are welcome, 5-7 working days for sample order; For the second order, requested MOQ for the bulk orders, the leading time will be depend on the order quantities. |
Q3: What's the payment terms of EVERGREEN accept? A3: We accept many payment terms: T/T, Trade Assurance, LC, Western Union, Money Gram, Escrow, Paypal, Escrow online are all accepted by us. |
Q4:How long do you offer for after-sales services of Evergreen products? A4: 12 months. |
Q5: How about the shipping term of EVERGREEN products? A5: EXW, FOB ,CIF ,CRF .Door to Door. |
Q6: Do you offer OEM/ODM service? A6: Yes, of course. We have a lot experience of OEM/ODM service as long as you need good quantity. |
Q7.How is your product quality? A7: QC regularly check the quality. Our products were damaged less than 3% over the past 6 years. |